Success story

Draxton Saltillo uses a STATCOM to comply with Grid Code 2.0

Ternium

icono address

Located in San Nicolás de los Garza, N.L.

ubicacion

Dedicated to the steel industry.

tension icono

Voltage level 230 Kv

foco icono

Demand of 80 MW.

Graftech

icono address

Located in Apodaca, Nuevo Leon, Mexico.

ubicacion

Dedicated to the manufacture of electrodes

tension icono

Power quality problems. High reactive power

Mexinox

icono address

Located in San Luis Potosí, Mexico

ubicacion

Dedicated to the metalworking industry.

tension icono

Voltage level 230 Kv.

foco icono

Demand of 15 MW

carga icono

Loading 3 Sendzimir Laminating machines

Posco

icono address

Located in Altamira, Tamaulipas.

ubicacion

Dedicated to the metalworking industry.

tension icono

Voltage level 115 Kv

foco icono

Demand of 5 MW.

carga icono

It has generation

Initial situation

The customer has compensation equipment already installed, but it is not enough to comply with the Grid Code, since achieving compliance for industries dedicated to this line of business is complex.

Initial situation

The customer has reactive compensation equipment already installed, as shown in the following table.

situacion inicial

Initial situation

The customer has reactive compensation equipment already installed, as shown in the following table.

situacion inicial

Findings

  • Inductive non-compliance 100% of the time
  • High load variations
  • No compensation equipment
  • A relatively high level of 2nd harmonic is present.

Problem

There is non-compliance with the parameters of power factor and current unbalance, established with the Grid Code 1.0. The PF is in inductive non-compliance 17% of the time.
72% of the time the PF is in capacitive noncompliance.Current unbalance has an average value of 19.23 %.

img-23img-99

Solution

Installation of two STATCOMs +/- 10 MVAr each
- One STATCOM was installed for each of the two transformers.
- 36 MVA mains (230 - 13.8 KV)
- Faster solution for power factor compensation
- Active harmonic current filtering capability
- Less area required per KVAR
- Newest and most reliable technology available

Imagen solución

Medium voltage solutions

Nuestras soluciones

Challenges

Consume and dynamically compensate for the reactive power in medium voltage, required by the load center to maintain the power factor within the limits established by the Grid Code 2.0 phase 2. Decrease the current unbalance, leaving it within the limits established by the Grid Code 2.0 phase 2.

Imagen retos

Solution

• Faster solution to compensate the power factor.
• Active harmonic current filtering capability.
• Smaller area required by KVAR.
• Newest and most reliable technology available.
• It has the flexibility to work with other compensation equipment.

To achieve compliance with Grid Code 2.0 phase 2, effective on April 8, 2026, it was necessary to install a STATCOM +/- 4 MVAR at DELTA, connected to the 6.6 Kv generator buses and consider leaving the existing compensation equipment in place.

Imagen solución

Installation

Imagen instalación

Benefits

- Compliance with Network Code 2.0 Phase 2.
- Stable voltage and low harmonic content.

- Increased productivity.
- Reduction of power outages.

Results

With the installation of the STATCOM, we achieved compliance with the power factor and current unbalance parameter, which was reduced by 60%, with the requirement established by the Grid Code 2.0 Phase 2, which can be seen in the following.

img 1 beneficios
img 2 beneficios

Problem

Draxton is a world-class company dedicated to the manufacture and commercialization of highly engineered castings, iron and aluminum machining components in the automotive business. In 2018, they approached us to request a Grid Code study in the Irapuato plant in which a non-compliance was detected in the following parameters:

  • Power factor

Problem

Draxton is a world-class company dedicated to the manufacture and commercialization of highly engineered castings, iron and aluminum machining components in the automotive business. In 2018, they approached us to request a Grid Code study in the Irapuato plant in which a non-compliance was detected in the following parameters:

  • Power factor

Problem

There is non-compliance in the following parameters, which are limited to those established by the Grid Code 1.0.

  • Power factor.
  • Individual harmonic components.
  • Total harmonic demand distortion.
  • Short-term voltage fluctuation index.
  • Long-term voltage fluctuation index.
  • Current unbalance.

Problem

img problema

There is non-compliance with the power factor parameter, established in the Grid Code 2.0. Phase 1.

  • The PF is in inductive noncompliance 13.63% of the time.
  • The PF is in capacitive noncompliance 55.18% of the time.

Why is STATCOM the best technology?

statcom vs svc
  • Equipment responds dynamically to the load
  • Operation of the equipment is by power electronics
  • Compared to its main predecessor, the SVC, the STATCOM has much higher efficiency and performance.

Unbalance

Imagen instalación

Power factor

Imagen instalación

Solution

Due to the variability of the load and that there is a considerable current unbalance, the solution for this case is a STATCOM.

For DIRAM each project represents a new challenge and we seek to adapt to each industry to implement the best cost-benefit solution. The biggest challenge of this project was to carry out the civil works, since it was a turnkey project, Diram was responsible for implementing the entire project for the client's convenience.

Imagen solución

Installation

Imagen instalación

Solution

Due to the variability of the load and that there is a considerable current unbalance, the solution for this case is a STATCOM.

For DIRAM each project represents a new challenge and we seek to adapt to each industry to implement the best cost-benefit solution.

Imagen solución

Power factor

Due to the type of loads installed in this industry, a dynamic compensation is required and not any technology can compensate with this demand tendency, so when evaluating the power factor, it was found to be in default, being divided as follows.

  • 58.5 % of the time there is inductive non-compliance.
  • 26.7% of the time there is capacitive non-compliance.

Evaluated with the limits of the Network Code 1.0

Imagen retos

Installation

Imagen instalación

Power factor

Due to the type of loads installed in this industry, a dynamic compensation is required and not any technology can compensate with this demand tendency, so when evaluating the power factor, it was found to be in default, being divided as follows.

  • 58.5 % of the time there is inductive non-compliance.
  • 26.7% of the time there is capacitive non-compliance.

Evaluated with the limits of the Grid Code 1.0

Imagen retos

Medium Voltage Solutions

Nuestras soluciones

Challenges

  • Consume and dynamically compensate for the reactive power in medium voltage, required by the load center to maintain the power factor within the limits established by the Grid Code 2.0, phase 1.
  • Mitigate 2x and 4x harmonics, leaving them in compliance with Grid Code 2.0, phase 1.
  • Decrease voltage fluctuations, leaving the Flicker parameters within the limits established by the Grid Code 2.0 phase 1.
  • Decrease the current unbalance, leaving it within the limits established by the Grid Code 2.0, phase 1.
Imagen retos

Solution

STATCOM Synchronous Static Compensator
• Faster solution for power factor compensation.
• Active harmonic current filtering capability.
• Smaller area required per KVAR.
• Newest and most reliable technology available.
• Flexibility to work with other compensation equipment.

To achieve compliance with the Grid Code 2.0 phase 1, effective on April 8, 2026, it was necessary to install a  STATCOM +/- 80 MVAR, connected to the 34.5 Kv main bus and a type C 2nd harmonic filter of 20 MVAr.

Imagen solución

Installation

Imagen instalación

Benefits

- Compliance with Grid Code 2.0 Phase 1.
- Stable voltage and low harmonic content.
- Increased productivity.
- Reduce electrode consumption.

- Increase refractory life.
- Obtain more favorable tariffs.
- Reduce outages.

Results

With the installation of the STATCOM, it was possible to maintain the power factor close to the unity value 97% of the time, complying with the limits established by the Grid Code 2.0, phase 1, which can be seen in the following graphs.

img 1 beneficios
img 2 beneficios

Features of our solutions

Nuestras soluciones

Resultados

- The STATCOM met the dynamic MVAr demand created by the variable load center operation.
- An average PF value of 0.99 is met 100% of the time.
- Improvements in power quality parameters
- For voltage unbalance, a maximum value of 0.171 % was obtained during the measurement period, remaining below the 2% limit established in the Grid Code.
- Current unbalance had a maximum value of 4.814 % during the measurement period, remaining below the 15% limit established in the CoR.
- The values of odd and even single harmonic components are within the limits.

- Harmonic currents were reduced, highlighting the 2nd harmonic current.
- The maximum THDD[%] value in the measurement period was 1.09 %, remaining below the limit, which for this load center is 3.75%.
- Flicker values for the 95th percentile Short Term Voltage Swing Index (STFI) was 0.382 remaining below the Grid Code limit of 1.0.
- Flicker values for the 95th percentile Long Term Voltage Fluctuation (LTI) Index was 0.329 remaining below the Grid Code limit of 0.80.

img 1 beneficios
img 2 beneficios
img 2 beneficios
img 2 beneficios
img 2 beneficios
img 2 beneficios
img 2 beneficios
img 2 beneficios

Our solutions features

Nuestras soluciones

Benefits

- Grid code compliance
- Longer useful life of plant equipment
- Lower energy and maintenance costs

- Improved process efficiency
- Increased production capacity
- Financial bonus from the supplier

Challenges

Consume and dynamically compensate the reactive power in medium voltage, required by the load center to maintain the power factor within the limits established by the Grid Code, phase 2.

Imagen retos

Solution

STATCOM Static Synchronous Compensator
• Faster solution to compensate for the power factor.
• Active harmonic current filtering capability.
• Less area required per KVAR.
• Newest and most reliable technology available.
• Flexibility to work with other compensation equipment

To achieve compliance with Grid Code 2.0 phase 2, effective from April 8, 2026, it was necessary to install a STATCOM +/- 12 MVAR, connected to the 20 Kv main bus and consider leaving the existing compensation equipment in place.

Imagen solución

Installation

Imagen instalación

Benefits

- Compliance with Grid Code 2.0 Phase 2.
- Stable voltage and low harmonic content.

- Increased productivity.
- Reduced power outages.

Results

With the installation of the STATCOM, it was possible to compensate for the necessary reagents, leaving the power factor at values of 0.98 inductive, 100% of the time, complying with the requirement established by the Grid Code 2.0 Phase 2, which can be seen in the following graphs.

img 1 beneficios
img 2 beneficios

Problem

icono address

Voltage fluctuations

ubicacion

Bad power factor

tension icono

Harmonic distortion

foco icono

Unbalanced operation

icono address

New load center

ubicacion

Voltage fluctuations

tension icono

Bad power factor

foco icono

Harmonic distortion

foco icono

Unbalanced operation

icono address

Poor power factor

ubicacion

Harmonic distortion

Solution

In order for the client to streamline its process and comply with the Grid Code, we delivered a STATCOM from 20 MVAr (ind) to 20 MVAr (cap). DIRAM was responsible for the complete execution of the project.

The installed solution can control reactive power seamlessly and in real time for an indefinite period, bringing our customer into compliance with the Grid Code.

Imagen solución

Stable voltage. Reduction of production stoppages

The lamination process generates load variations that lower the voltage periodically. Although these variations do not generate flicker problems, they are perceptible in electronic and process devices sensitive to voltage dips. In an unfavorable scenario, a strong voltage drop generates a productive shutdown by tripping the undervoltage protections.

With the operation of the STATCOM, given its fast response, you can control these strong voltage drops minimizing the risk of tripping.

Imagen instalación

Operational results

Today, our customer was able to connect its plant to the SEN, meeting all the requirements of the Mexican Grid Code, along with other operational benefits. From this project, we celebrate:

Imagen instalación

Solution

The future operation was simulated with specialized software, thus dimensioning a STATCOM of +/- 40 MVAr to ensure compliance with the Grid Code prior to the energization of the plant.

DIRAM was fully responsible for the execution of the project, in addition to accompanying the client throughout the process of connecting the load center.

Imagen solución

Operational results

From this project, we celebrate that today, our customer was able to connect its plant to the SEN, meeting all the requirements of the Mexican Grid Code, along with other operational benefits.

Imagen instalación

Solution

In order for the client to streamline its process and comply with the Grid Code, we delivered a STATCOM from 160 MVAr (ind) to 320 MVAr (cap). DIRAM was responsible for the design, supply, commissioning and start-up of the equipment.

The installed solution can control reactive power seamlessly and in real time for an indefinite period, bringing our customer into compliance with the Grid Code.

Imagen solución

Operational results

Imagen instalación

Stable voltage increases productivity

Given the better regulation at the 34.5 kV node voltage, the melting furnace has more power available. Analogous to a hydraulic system, where, no matter how much we open the tap, there is no change in water flow. This is because the limit given by the pipe diameter has been reached. Under this example, the STATCOM would allow to "expand" the pipes in order to increase the flow, since the voltage does not drop even under load. Today, our customer increased the production of its steel mills due to the implementation of our solution.

Imagen instalación

Challenges

Products

Solution

Results