We support users connected in medium or high voltage who have not submitted a work plan to the CRE or who received a request to update their old Network Code work plan.
A Grid Code work plan is a program with the necessary steps to comply with the requirements of the Regulatory Manual of Technical Requirements for the Connection of Load Centers to the National Electric System that the user connected in medium or high voltage must perform in order to inform the CRE: