Implementation of a work plan to comply with the Grid Code.

blanco diram

We support users connected in medium or high voltage who have not submitted a work plan to the CRE or who received a request to update their old Network Code work plan.

Learn what Diram can do for you

A Grid Code work plan is a program with the necessary steps to comply with the requirements of the Regulatory Manual of Technical Requirements for the Connection of Load Centers to the National Electric System that the user connected in medium or high voltage must perform in order to inform the CRE:

  • The compliance status of its load center.
  • The actions to be taken in case of non-compliance.
  • Before making the work plan it is necessary to make a Power Quality Study to know the current compliance of the user with the parameters of the Grid Code. In Diram we can help you to do it since we have class A meters.

¿Why choose Diram?

  • We have qualified personnel to take measurements and analyze power quality compliance.
  • We advise you during the whole process.
  • We help you in the elaboration of an adequate work plan.
  • We provide the right solution for every need.