The plant was in non-compliance with the grid code in PF parameters under low load conditions. In addition, the plant was constantly experiencing voltage fluctuations causing problems in electronic equipment and restart or failure of the robots.
We installed dynamic compensation equipment that will resolve defaults under low load conditions and mitigate the effects of voltage fluctuations on electronic equipment.
Engineers involved in the project:
Project leader: Jorge Alberto Luna
Project manager: Alejandra González
Vendor: Gonzalo Campuzano